The Murdock Canal Trail

Trail Design and Engineering

The Murdock Canal Trail runs for 17 miles from 800 North in Orem to Bull River Road along Timponogos Highway in Lehi and passes through seven Cities including Orem, Pleasant Grove, Lindon, Ceder Hills, Highland and Lehi. Barry Bunderson worked on segments of the trail design while employed at a different firm. The project delivery method was a Design-Build method administered through UDOT. The design team Barry participated with was the Ames Construction team. The Design-Build method required each contractor to create an architectural/engineering team and develop construction drawings to approximately a 60%+ level so that the contractor had enough information to create a bid proposal for construction. The design included the paved trail, underpass and overpass bridge structures, drainage, and trailhead design with parking, mini parks, and restroom facilities. Mr. Bunderson performed geometric design for segments of the trail as well as trailhead parking, grading and drainage design as well as grading and drainage design at underpass bridge structures including geometric design of retaining wall structures. The Ames Construction team was not selected to construct the trail project.

Design Build

  • Client:UDOT Wasatch Front Regional Council
  • Categories:
  • Skills:
    • Construction Administration
    • Engineering
    • Working Drawings
  • Share Project :